P. 56

Chapter 2  Results of Technical Cooperation Project



          3)  Re-examining the     Re-examinations of the specification of research equipment to be procured un-
             specification of re-   der ODA Loan were conducted by JSUC as follows:
             search equipment        - Eight (8) main equipment of the Package 2-1: June-July 2017
                                     - Eight (8) main equipment of the Package 2-2: October 2018
                                     - Four (4) equipment of Package 2-3: October 2019
          (Plan:
                                    [Note] This activity was rephrased as “Negative check of detail design of re-
           Apr. 2018 – Nov. 2018)   search equipment” by JICA.
          4)  Identifying CTU’s     These issues were discussed in several sessions with issues of Activity 2-9
             challenges/solu-       among the key members of relevant units of CTU, PMU members and the Project
             tions of adminis-      experts in the first half of 2017 and summarized in a paper which was a basic
             tration necessary      document for making plans of short-term training in Japan.
             for enhancement of
                                   For enhancement of administration for research activities, a Committee for
             research and edu-
                                    Ethical Guidelines/Instructions on Animal Experimentation was established
             cation capacity                                          rd
                                    (Decision No. 585/QD-DHCT, Mar. 23 , 2020).
                                      The committee finished drafting “Regulation on Animal Experimentation at
                                      Can Tho University” with technical support by the Academic Advisor of the
          (Plan:
                                      Project, and now revising the draft with comments from relevant units of CTU.
           July 2016 – Mar. 2017)
                                      The committee and the Project are under consideration of developing an
                                      online application and management system for CTU researchers and staff
                                      in compliance with the CTU’s ethical guidelines/instructions on animal
                                      experimentation.
                                                                                            (See Chapter 2.2.1c)
                                   Activity to enhance the consciousness of the CTU staff members on ABS (Access
                                    to Genetic Resources and Benefit Sharing from Utilization of Genetic Resources)
                                      Because of occasional difficulties in transferring genetic materials from
                                      Viet Nam to Japan for collaborative research, a lecturing meeting is expected
                                      to be held for this purpose.
          5)  Implementing         Twelve (12) short-term training courses were carried out in Japan for 16
             short-term training    members of CTU staff according to the plan.
             of administrative     Additional short-term training in Japan on management of common-use facilities
             staff                  was under consideration.



          (Plan: 2018-2020)
























                                                                                                            29